|
|
|
SAP
Calculation Checklist
All of the information
listed below is needed in order to carry out the SAP calculations. If
any of it is not provided then time will obviously be wasted in chasing
it up, which may cause an increase in costs. Please us this list to
ensure that all of the necessary data is provided. If you have any
queries please don't hesitate to contact us for clarification. - A site plan, showing the orientation of the building and the locations of any nearby buildings
- A
plan of each floor, ideally annotated with dimensions, or printed so
that dimensions can be scaled (not less than 1:100, preferably 1:50)
- Sections showing the interior height of each storey, and of each room if they vary within a storey
- Elevations, again dimensioned or scalable, showing all windows, doors, chimneys and flues.
- Constructional
details or U-values of all roofs, walls & floors, and
specifications for all windows and doors. For windows SAP requires that
the manufacturer's specified U-value should be used wherever possible
- Details of space and water heating system(s), including:
- Fuel and model number of boiler, if known, or boiler type, e.g. wall-mounted, fan assisted, combi, etc.
- Controls to be used, e.g. programmer, room stat, cylinder stat
- Hot water tank size, location and insulation type / thickness.
.
[Back]
|
|